Associated Petroleum Terminals Ltd
Immingham Oil Terminal
Inspection of external pipework & steelwork revealed coating breakdown of overwater pipework, highlighting the requirement of a fabric maintenance campaign.
Weight restrictions on the jetty were managed throughout the access design and installation process.
AIM provided our client with a designed access system which managed weight limitations throughout the execution phase.
To ensure efficient delivery, AIM assigned a multidisciplined team of IRATA trained blaster/spraying technicians, ensuring no schedule impact from access system modifications.
The streamlined schedule reduced client's expenditure ~35% and eliminated contact points from access systems.
7 years paintwork guarantee provided to client.