Front-End Engineering Design

Uninsulated pipework and steelwork at the facility had to be addressed to determine the upgrade requirements. AIM was tasked with conducting a FEED study of all the pipework and structural elements. The purpose of the risk-based inspection (RBI) was to determine the integrity of the existing coating application.

02
Project:
Front-End Engineering Design

ExxonMobil


Opportunity
Uninsulated pipework and steelwork at the facility had to be addressed to determine the upgrade requirements. AIM was tasked with conducting a FEED study of all the pipework and structural elements. The purpose of the risk-based inspection (RBI) was to determine the integrity of the existing coating application.

Improvements
AIM was engaged to complete the study using our engineering, planning and quality surveying skills. We conducted the study and presented our findings on the integrity of the coating.

Benefits
  • ExxonMobil received an independent survey from a multi-disciplined engineering team that could meet all requirements.
  • The project team managed all aspects of the project controls, created an execution schedule and project OOM budget.
  • As part of the scope of work, AIM was asked to provide a single of accountability for the project to ensure clear communication throughout.
  • The study considered all quality assurance standards, ensuring the client would meet all compliance.

Find out more about how AIM can assist with your FEED study. Call us on 01324 868 420, or email enquiries@asset-imgroup.com.